The cross-section

How a paver base is built

Read down from the top. These are typical depths, and your estimate states yours.

  1. 01
    Top

    Step 1: Pavers

    Concrete pavers chosen for the load: 60 mm (about 2⅜ in.) for a patio or walk, 80 mm (about 3⅛ in.) for a driveway. Laid tight in the pattern you picked, cut at the edges, never forced.

  2. 02
    Locks it

    Step 2: Joint sand

    Swept into every joint, then the surface is compacted again so the pavers lock together. A last pass the day after, once the sand has settled.

  3. 03
    About 1 in.

    Step 3: Bedding sand

    One inch of coarse sand, screeded flat. It levels the pavers. It isn't structure, so we never use it to fill low spots in the base.

  4. 04
    4–6 in. patio, 8–12 in. driveway

    Step 4: Compacted stone base

    Crushed stone spread in lifts of about 4 in. and run over with a plate compactor, lift after lift. Thicker where the soil is soft or the load is a truck. Your depth is written in your estimate.

  5. 05
    When the dig calls for it

    Step 5: Fabric, where the soil needs it

    Much of central Ohio is clay. Where it's soft or holds water, geotextile fabric goes under the stone so the base doesn't sink into the soil.

  6. 06
    Before any stone

    Step 6: Dug-out, compacted soil

    We take out the sod and topsoil, shape the soil underneath to fall away from the house, and compact it before any stone arrives. A patio falls about ¼ in. per foot.

Hands pressing red clay pavers into place on a level bed of sand beside a boot

By use

Patio and walk, or driveway

What changes when a vehicle drives on it.

Patio and walk, or driveway
DrivewayPatio and walk
Paver thicknessDriveway80 mm, about 3⅛ in.Patio and walk60 mm, about 2⅜ in.
Stone base, typicalDriveway8 to 12 in.Patio and walk4 to 6 in.
CompactionDrivewayIn lifts of about 4 in., more of themPatio and walkIn lifts of about 4 in.
FabricDrivewayWhere the soil is soft or wetPatio and walkWhere the soil is soft or wet
Edge restraintDrivewayAll sides, anchoredPatio and walkAll sides
FallDrivewaySet to the apron and the drainPatio and walkAbout ¼ in. per foot, away from the house

What we won't do

Shortcuts that look fine until the first winter

Any of these saves a crew a day. None of them are in an estimate of ours.

  • Lay on unprepared soil

    Pavers on topsoil sink where the grass roots rot.

  • Fill with sand instead of stone

    Sand holds water and moves. Stone locks.

  • Compact once, at the top

    Each lift is compacted before the next goes on.

  • Skip the edge

    Without restraint the pavers spread and the joints open.

  • Fill low spots with bedding sand

    The bed is one inch. A thick bed settles unevenly.

  • Dig without calling 811

    Public utilities are marked before the first shovel.

How we build

See your yard's cross-section on the estimate

Every layer, every depth, in writing.